– Added an upper deck to the Secondary cafeteria’s eating area
– Expanded the Reception area
– Built a new Arts & Music Conservatory
– Created a new football (soccer) field with artificial turf in Secondary
– Refurbished and enlarged the K / Primary cafeteria eating area, &
– Continued top grow our two libraries.